Project Description

Introduction
November 2019 Hawthorn Estates was asked to complete works in Centre of Manchester.

Customer
An office fit-out was requested, the office space was white boxed and ready to be adjusted for the tenant.

Hawthorn Estates were able to use the open-plan layout to assess where the new meeting rooms would be located and the ideal locations for a staff kitchen area.

After the client confirmed the locations of the meeting rooms and kitchen area, the Design team got to work creating a CAD drawing for the client’s approval.

The clients required the works to be completed within a four-week timescale.

Works began on the office space, selected carpet tiles were removed so that access could be gained for the election to install concealed floor sockets.

Wall partitions were erected to create the separate meeting rooms and kitchen area.

One large meeting room was installed to the rear of the office space with floor to ceiling windows for light access into the main hub.

Three smaller rooms were fixed with window access for natural lighting.

A large kitchen was installed providing efficient unit space for appliances and shelving space for kitchen utensils. The room provides space for 13 people to comfortably sit and eat.

Plumbing was assessed, corrections to the pipework and water supply were installed.

Certified carpet fitters were employed to reinstall the carpet tiles ensuring no issues at a later date.

Health and Safety

Correct access equipment was used on all works, as well as all the necessary PPE to make the job safe and easier.

All personnel hold correct licences to use any and/or all the heavy machinery and have been given the correct training before any works.

Safety of our staff is always a priority, all safety precautions were put into place.

Tenants

The Clients were impressed by the work ethic and organisation showed during this project.

The clients are impressed that the fit-out was completed within the time scale and budget, this allowed the office furniture to be set up before the employees were back to work in January 2020.

Employees have been extremely complimentary about the quality of work.  The site manager has been singing [Hawthorn Estates Lts] praises to [the managing agents].